Photos
The work
Steel stud framing, hanging board, taping and texture — the work step by step, from the first stud to the last coat. More photos go up as jobs finish.
Rows of steel studs and door frames.
Light-gauge steel framing.
Commercial shell, hung and taped.
Stairwell and soffits boarded.
A vaulted great room, hung and finished.
Taped walls under an open truss ceiling.
A vaulted room hung and taped.
A commercial room hung and taped.
A room taped and coated.
Sprayed wall texture.
Textured ceiling.
Finished corridor, smooth walls.
Finished commercial space.Photo credits
Some photos on this page are used under free licences and are credited below. They are not covered by our copyright. Photos are colour-toned for this site; the colour-toned versions of CC BY-SA photos are shared under the same licence.
- Rows of steel stud framing: MTA Capital Construction / CC BY 2.0, colour-toned
- Light-gauge steel framing: P199 / Public domain
- Sprayed wall texture: Yinan Chen / Public domain
- Textured ceiling: David R. Tribble (Loadmaster) / CC BY-SA 3.0, colour-toned
- Taping knives and board offcuts (page-not-found page): Timothyjosephwood / CC BY-SA 4.0, colour-toned
